How to Carry Out Yield Test for Borehole in Nigeria

A yield test for a borehole is essential to determine the sustainable flow rate of water that can be extracted without over-pumping and depleting the aquifer. This process helps in understanding the borehole’s productivity, ensuring efficient water use, and planning for appropriate pump installation. Here’s a step-by-step guide on how to carry out a yield test for a borehole in Nigeria:

1. Importance of a Borehole Yield Test

  • Determines Sustainable Flow Rate: A yield test measures the amount of water a borehole can produce over a specific time without causing significant drawdown (a drop in the water level).
  • Ensures Pump Sizing and Installation: Proper pump sizing is crucial for the efficient operation of the borehole. A yield test helps determine the most suitable pump capacity and type.
  • Monitors Aquifer Health: Regular yield testing helps monitor changes in the aquifer over time, indicating whether the groundwater levels are stable, rising, or falling.

2. Types of Borehole Yield Tests

There are several methods for conducting a borehole yield test, but the two most common are:

  • Step Drawdown Test: This test involves pumping water from the borehole at gradually increasing rates in steps, usually lasting 1 to 2 hours each, to determine how the aquifer responds to different pumping rates.
  • Constant Rate Test: After determining an optimal pumping rate from the step drawdown test, the constant rate test involves pumping water from the borehole at a consistent rate for an extended period, typically between 24 to 72 hours, to assess the sustainable yield.

3. Step-by-Step Process for Conducting a Borehole Yield Test

Step 1: Preparation and Preliminary Assessment

  • Gather Required Equipment:
    • A suitable submersible or surface pump (capable of variable flow rates).
    • A flow meter to measure the discharge rate of water.
    • Water level meter or dipper to measure the static water level and drawdown.
    • Discharge pipes or hoses.
    • A generator or power source to run the pump.
    • A stopwatch or timer for accurate timekeeping.
  • Inspect the Borehole: Ensure that the borehole is properly constructed and developed, free of debris, and equipped with proper casing and screens to prevent collapse during pumping.
  • Measure Static Water Level: Use a water level meter or dipper to measure the static water level in the borehole before starting the test. This is the water level when the borehole is not being pumped.

Step 2: Conduct the Step Drawdown Test

  1. Start Pumping at a Low Rate: Begin by pumping the borehole at a low rate (e.g., 0.5 liters per second or 1,800 liters per hour) for a set period (typically 1 hour). Monitor and record the water level and flow rate regularly (every 5-10 minutes).
  2. Increase Pumping Rate: After the first step, increase the pumping rate incrementally (e.g., 1.0 liters per second or 3,600 liters per hour) and continue pumping for another hour. Again, monitor and record the water level and flow rate.
  3. Repeat Steps: Continue increasing the pumping rate in steps (e.g., 1.5 liters per second, 2.0 liters per second, etc.) until you reach the maximum safe rate for the borehole or until you observe significant drawdown.
  4. Record Data: Throughout the test, maintain detailed records of the pumping rates, water levels, and time. This data will help analyze the borehole’s performance and determine the optimal pumping rate.

Step 3: Conduct the Constant Rate Test

  1. Set the Pump to an Optimal Rate: Based on the data from the step drawdown test, select an optimal pumping rate that does not cause excessive drawdown.
  2. Pump Continuously for 24-72 Hours: Begin pumping water from the borehole at the selected constant rate for an extended period, usually between 24 to 72 hours. The longer duration helps determine the borehole’s long-term sustainability.
  3. Monitor and Record Water Levels: Use the water level meter or dipper to monitor and record the water level in the borehole at regular intervals (every 15-30 minutes in the first few hours, then every hour or more as the test progresses).
  4. Monitor Flow Rate: Ensure the flow rate remains constant throughout the test. If there are significant changes, adjust the pump accordingly and note any variations.
  5. Measure Recovery Period: After completing the constant rate test, stop pumping and measure how quickly the water level in the borehole recovers to its static water level. The recovery period provides insight into the aquifer’s recharge rate.

Step 4: Data Analysis and Interpretation

  • Analyze Drawdown and Recovery Data: Plot the drawdown data against time and flow rate to assess the borehole’s performance and aquifer response. The goal is to identify the safe yield—the maximum rate at which water can be pumped without causing excessive drawdown.
  • Determine Specific Capacity: The specific capacity is calculated by dividing the pumping rate by the drawdown. This measure helps compare the performance of different boreholes and aquifers.
  • Report Findings: Prepare a comprehensive report that includes all measured data, calculated specific capacity, observations during the test, and recommendations for pump sizing and borehole management.

4. Equipment and Cost Considerations

  • Cost of Equipment Rental and Professional Services: If you do not have the necessary equipment or expertise, consider hiring professional services. The cost of carrying out a yield test in Nigeria, including equipment rental and labor, typically ranges from ₦50,000 to ₦150,000 or more, depending on the location, depth, and complexity of the borehole.
  • Expertise Required: Ensure the personnel conducting the yield test are experienced in hydrogeology or borehole management to guarantee accurate data collection and interpretation.

5. Importance of Regular Yield Testing

  • Regular yield testing is crucial for borehole maintenance and sustainable water management. It helps detect changes in the aquifer, identify potential issues like declining water levels or pump inefficiencies, and plan for corrective measures.

Conclusion: Get Professional Borehole Yield Testing Services with Borehole Nigeria

If you need professional assistance with borehole yield testing or any other borehole-related services in Nigeria, Borehole Nigeria is here to help. We provide comprehensive services, including borehole drilling, yield testing, water treatment, and maintenance, ensuring optimal performance and sustainability of your water supply system. Contact us today for a consultation and ensure the efficient operation of your borehole!